Skip to content

Service

Permit and construction drawings

Measured drawings and a permit set, coordinated with your engineer, ready for Toronto Building.

Starting from
CA$4,800.00
Typical timeline
4 to 6 weeks
Permit and construction drawings
Existing conditions survey, proposed plans, sections and elevations, a lighting and electrical plan, and coordination with the structural engineer. Drawings a contractor can price accurately, which is the best protection against change orders.

What this covers

interior-architect

Starting from

CA$4,800

Final quote depends on scope.

  • Typically 4 to 6 weeks

Other services.